BESS-01

Producing

Battery · Tesla Megapack 2 · Gondo

Producing
Live
Now
Polled every 5 seconds; the 3D model follows these values.
51% of rated

State of charge

84.5 %

Charge rate

51 % of rated

Rated power

2,000 kW

Output now

1,028.0 kW

Energy today

0 kWh

Lifetime

5,510 MWh

Availability

99.65 %

Runtime

3,445 h

Next service

in 329 h

Last seen

13:59:45

Telemetry

State of charge

85.00 %

Max cell temperature

18.90 °C

Min cell temperature

9.10 °C

Enclosure heating

9.10 kW

Cell spread

13.90 mV

Round-trip efficiency

87.20 %

History
Power and snow-free potential
Active power against what the asset would make with clean modules. The gap is the snow loss.
Today
Hourly energy
MWh delivered and lost to snow, hour by hour since midnight.
Alarms
Asset alarms
Open and recent events for this asset.

Enclosure heating active

BESS-01· 11-18 07:21
Low